One-stop Customized Solution for Engineering & Mining Drilling Equipment
+86-536-222 7856
English
bored piling machine blogs
You are here: Home » Blogs » BEYOND Mining's Five 60-Ton Hydraulic Water-Well Rigs Arrive in North Africa; First BWR-600H Training Completed On Site

BEYOND Mining's Five 60-Ton Hydraulic Water-Well Rigs Arrive in North Africa; First BWR-600H Training Completed On Site

Views: 0     Author: Site Editor     Publish Time: 2026-09-20      Origin: Site

Inquire

facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
whatsapp sharing button
kakao sharing button
snapchat sharing button
telegram sharing button
sharethis sharing button

image.png

image.png

On September 10, 2026, five 60-ton hydraulic water-well drilling rigs dispatched to North Africa by BEYOND Mining & Engineering — a sister company of BEYOND Petroleum — crossed oceans and deserts to arrive safely at the project site. On September 16, the BEYOND team, working alongside the client's drilling crew, completed the first training session on the BWR-600H water-well drilling rig. Delivering equipment is only one part of the job; ensuring that on-site operators can run the rigs safely and at maximum capacity is what determines whether a water-well project stays on schedule.

Delivered Across Oceans and Deserts

The five 60-ton hydraulic water-well drilling rigs crossed oceans and deserts and arrived safely at the project site on September 10, providing solid equipment support for the project's progress.

image.png

image.png

Service First: People and Coordination Arrive Ahead

Cindy, the project lead from BEYOND Mining & Engineering, arrived on site as early as September 1 to study the project, familiarize herself with site conditions, and assist the client company with project coordination. On September 14, Beyond General Manager Alex arrived at the project site to prepare for on-site service.

图片1
图片2
WPS图片

Training Is Not an “Add-On” — It Is Part of the Solution

Delivering equipment is only part of the equation. BEYOND has always regarded rig commissioning and operator training as an indispensable part of an integrated drilling solution — not an afterthought.

On September 16, the BEYOND team, working together with the drilling crew, completed the first training session on the BWR-600H water-well drilling rig. The training covered the following theoretical modules:

• Rig fundamentals — structure, main systems, and how a water-well rig works

• Air compressors — working principles and key operating points

• Solids control system — mud circulation and cuttings handling

• Drill-string connections — joint types and thread forms

• On-site drilling methods and operating modes

Watching the team go from facing a “new rig” to confidently running “our rig” in a single day — this is the part of our work we enjoy the most.

image.png
image.png

If you are looking for oil drilling equipment or mining and water-well equipment, please feel free to contact us.

Tel

+86-536-222-7856
+86-13475681371

Address

Floor 21, Fortune Center Building, Shengli East Street, Weifang City, Shandong Province, China.
Our company focuses on providing overseas clients with one-stop customized solutions for engineering and mining drilling equipment.

Quick Links

Product Category

Contact Us
Copyright  2025 Shandong BEYOND Engineering & Mining Equipment Co., Ltd. All Rights Reserved. Sitemap. Privacy Policy.